The Noordersluis lock in IJmuiden needs replacing. The aim of a new, larger sealock at the entrance of the North Sea Canal is to make the Amsterdam port region more accessible.

Rijkswaterstaat has awarded the contract for the construction of the new lock to contractor consortium OpenIJ, consisting of VolkerWessels, DIF and BAM-PGGM.

 

The ‘Nieuwe Grote Zeesluis’ (New Large Sea Lock), which will be built next to the existing sea locks, will have a width of 70 metres, a length of 500 metres and a depth of 18 metres.

Within OpenIJ, Visser & Smit Hanab is responsible for coordinating all temporary and definitive connections on the construction site. This means that existing cables and pipes of network operators must be rerouted, and the new lock must be provided with new cables and pipes, which are then connected to the existing buildings.

Four HDD's

For the purpose of this rerouting and construction of new pipelines, four horizontal directional drillings were performed underneath the locks complex.

The drillings were made through the 250-tonne rig over lengths of 911 metres (twice), 498 metres and 430 metres. HDPE casings with diameters of 200 mm and four casings with diameters of 160 mm (HDD1a +1b), 560 mm (HDD2) and 450 mm (HDD3) were inserted, in which various cables and pipelines were installed.

 

Facts and figures

  • HDD01a - Installation of a wastewater pipeline
    911 meter, 200mm HDPE pipe, in which we pulled in a 110mm medium carrying HDPE pipeline for sewerage
  • HDD01b - Installation of a combination of medium carrying pipelines (electricity cables, signal cables)
    911 meter, 4x160mm in 2 of the 160mm pipes we pulled in a 50mm duct and 3x40mm ducts
  • HDD02 - Installation of a casing in which a combination of medium carrying pipelines (electricity cables, signal cables, drinkwater, wastewater) is installed
    498 meter, 1x560mm HDPE pipe in which we installed 1x200mm, 2x160mm, 1x63mm, 1x50mm, 11x40mm HDPE ducts
  • HDD03 - Installation of a casing in which a combination of medium carrying pipelines (electricity cables, signal cables, drinkwater, wastewater) is installed
    430 meter, 1x450mm HDPE pipe in which we installed 1x200mm, 1x110mm, 7x40mm HDPE ducts