icon-arrow-right icon-play icon-close
HomeProjectsOued River Crossing

Oued River Crossing

Agadir, Morocco

Visser & Smit Hanab was contracted for the crossing of the Oued river as part of the construction of a wastewater pipeline. 

 

A 250 ton drill rig was used for the 370 meter river crossing of the 1200 mm PE pipeline.

 

 

Facts and figures

+