Year |
Country |
Client |
Project |
Drilled length |
Diameter |
HDD/MT |
2017 |
Netherlands |
Nederlandse Gasunie |
Gasunie intends to make different adjustments to the Zwolle-Heerenveen pipeline route as part of the Gasunie Network Improvement Program (GNIP). Gasunie has chosen horizontal directional drillings to make these adjustments to cross existing situations. |
162 m |
0 mm |
HDD |
2017 |
Netherlands |
Nederlandse Gasunie |
Gasunie intends to make different adjustments to the Zwolle-Heerenveen pipeline route as part of the Gasunie Network Improvement Program (GNIP). Gasunie has chosen horizontal directional drillings to make these adjustments to cross existing situations. |
240 m |
0 mm |
HDD |
2017 |
Netherlands |
Nederlandse Gasunie |
Gasunie intends to make different adjustments to the Zwolle-Heerenveen pipeline route as part of the Gasunie Network Improvement Program (GNIP). Gasunie has chosen horizontal directional drillings to make these adjustments to cross existing situations. |
162 m |
0 mm |
HDD |
2017 |
Netherlands |
Nederlandse Gasunie |
Gasunie intends to make different adjustments to the Zwolle-Heerenveen pipeline route as part of the Gasunie Network Improvement Program (GNIP). Gasunie has chosen horizontal directional drillings to make these adjustments to cross existing situations. |
113 m |
0 mm |
HDD |
2017 |
United-Kingdom |
MC Nicolas |
UK Power Networks (UKPN) plans to reinforce the 132kV / 33kV network Felixstowe, Harwich and Dovercourt. UKPN has signed a long term framework agreement with McNicholas. Visser & Smit Hanab has been awarded the feasibility study of the horizontal directional drillings under the river Stour, river Orwell and under the A120 and railway (UTX). |
940 m |
0 mm |
HDD |
2017 |
Belgium |
Elia |
Elia is constructing a new electricity connection (2x150kV) between post Lillo and post Noorland-Zandvliet. For this route the locks Zandvliet and Berendrecht need to be passed. This passage will be realised with two HDD's. On each HDD a casing pipe will be applied. |
1326 m |
0 mm |
HDD |
2017 |
Belgium |
Elia |
Elia is constructing a new electricity connection (2x150kV) between post Lillo and post Noorland-Zandvliet. For this route the locks Zandvliet and Berendrecht need to be passed. This passage will be realised with two HDD's. On each HDD a casing pipe will be applied. |
1262 m |
0 mm |
HDD |
2017 |
Netherlands |
Liandon |
Liandon has ordered the execution of an HDD in preparation of the diversion of high voltage power connections for the benefit of a planned reconstruction of the Schipluidenlaan. |
335 m |
0 mm |
HDD |
2017 |
Turkey |
Tekfen |
The Trans Anatolian Natural Gas Pipeline Project covers the development of the complete construction of a 1.850 km long DN 1400 natural gas pipeline from the Turkish |
549 m |
0 mm |
HDD |
2017 |
Turkey |
Tekfen |
The Trans Anatolian Natural Gas Pipeline Project covers the development of the complete construction of a 1.850 km long DN 1400 natural gas pipeline from the Turkish |
553 m |
0 mm |
HDD |
2016 |
Netherlands |
Brabant Water via Van Gelder |
HDD for the construction of a drinkwater transport pipeline between Zevenbergen and Breda. |
0 m |
630 mm |
HDD |
2016 |
Netherlands |
Vitens |
HDD for a motorway crossing for the installation of a PE water pipeline between Epe and Zutphen |
0 m |
450 mm |
HDD |
2016 |
United-Kingdom |
Volkerinfra UK |
2 HDD crossings under the A27 Upper Brighton road in Worthing. This location is part of the 150kV cable route for the Rampion Offshore Wind Farm. |
233 m |
0 mm |
HDD |
2016 |
United-Kingdom |
Volkerinfra UK |
2 HDD's crossings under the A27 Upper Brighton road in Worthing. This location is part of the 150kV cable route for the Rampion Offshore Wind Farm. |
235 m |
0 mm |
HDD |
2016 |
Netherlands |
Vitens |
HDD for a road crossing for the installation of a PE water pipeline between Epe and Zutphen |
81 m |
450 mm |
HDD |
2016 |
Netherlands |
Vitens |
HDD for a motorway crossing for the installation of a PE water pipeline between Epe and Zutphen |
116 m |
450 mm |
HDD |
2016 |
Netherlands |
Vitens |
HDD for a road crossing for the installation of a PE water pipeline between Epe and Zutphen |
192 m |
400 mm |
HDD |
2016 |
Netherlands |
Nederlandse Gasunie |
Installation of 12" steel gastransportpipe for the benefit of the diversion of the N222 provincial motorway |
893 m |
0 mm |
HDD |
2016 |
Netherlands |
TenneT |
Two HDD's for a cable route between Woensdrecht and Bergen op Zoom |
133 m |
250 mm |
HDD |
2016 |
Netherlands |
TenneT |
Two HDD's for a cable route between Woensdrecht and Bergen op Zoom |
125 m |
250 mm |
HDD |
2016 |
Belgium |
PPS |
V&SH realised an HDD for the diversion of existing gas lines, for the benefit of the future widening of the Albertchannel. |
795 m |
800 mm |
HDD |
2016 |
Netherlands |
Joulz |
For the purpose of the Exxon Mobil connection, two new 150kV connections need to be made.
From the powerstation Geervliet 2 to the ExxonMobil station at the Botlekweg in Rotterdam.
|
441 m |
600 mm |
HDD |
2016 |
Netherlands |
Joulz |
For the purpose of the Exxon Mobil connection, two new 150kV connections need to be made.
From the powerstation Geervliet 2 to the ExxonMobil station at the Botlekweg in Rotterdam.
|
468 m |
600 mm |
HDD |
2016 |
Netherlands |
Joulz |
For the purpose of the Exxon Mobil connection, two new 150kV connections need to be made.
From the powerstation Geervliet 2 to the ExxonMobil station at the Botlekweg in Rotterdam.
|
680 m |
600 mm |
HDD |
2016 |
Netherlands |
Joulz |
For the purpose of the Exxon Mobil connection, two new 150kV connections need to be made.
From the powerstation Geervliet 2 to the ExxonMobil station at the Botlekweg in Rotterdam.
|
680 m |
600 mm |
HDD |
2016 |
Netherlands |
Liander |
Liander, a Dutch powergrid operator, intends to create a medium-voltage connection between the powerstation of NUON and the terrain of Rijkswaterstaat in Velsen-Noord. To make this possible, a HDD is designed which crosses the Binnenkanaal and the Binnenspuikanaal. |
945 m |
350 mm |
HDD |
2016 |
Turkey |
Tekfen |
The Trans Anatolian Natural Gas Pipeline Project covers the development of the complete construction of a 1.334 km long DN 1400 natural gas pipeline from the Turkish |
588 m |
300 mm |
HDD |
2016 |
Turkey |
Tekfen |
The Trans Anatolian Natural Gas Pipeline Project covers the development of the complete construction of a 1.334 km long DN 1400 natural gas pipeline from the Turkish |
588 m |
1400 mm |
HDD |
2016 |
Turkey |
Tekfen |
The Trans Anatolian Natural Gas Pipeline Project covers the development of the complete construction of a 1.334 km long DN 1400 natural gas pipeline from the Turkish |
632 m |
300 mm |
HDD |
2016 |
Turkey |
Tekfen |
The Trans Anatolian Natural Gas Pipeline Project covers the development of the complete construction of a 1.334 km long DN 1400 natural gas pipeline from the Turkish |
629 m |
1400 mm |
HDD |
2016 |
Belgium |
Air Liquide via V&SH N.V. |
For the diversion of the existing Air Liquide hydrogen pipeline for the benefit of a future overflow area of the Schelde river. |
1040 m |
250 mm |
HDD |
2016 |
Netherlands |
TenneT |
MT Waalhaven 20mtr 552 mm |
20 m |
552 mm |
Microtunne |
2016 |
Netherlands |
KWS Infra |
In the area of Den Haag few existing wastewater pipes are been renewed. Therefor a drilling had to be made next to existing pipe. This project was in a dense living area. |
12 m |
616 mm |
Microtunne |
2016 |
Netherlands |
Nederlandse Gasunie |
Purpose of the drillingproject is to connect several electricitylines. The connection is made by drilling under existing cables (leidingstraat) and road. |
99 m |
1720 mm |
Microtunne |
2016 |
Netherlands |
IXAS |
In order to connect several puddles and control surfacewater levels, few drillings are made. |
99 m |
1080 mm |
Microtunne |
2016 |
Netherlands |
IXAS |
In order to connect several puddles and control surfacewater levels, few drillings are made. |
57 m |
1080 mm |
Microtunne |
2016 |
Netherlands |
Plegt & Vos BV |
In the area of Almere few existing wastewater pipes are been renewed. Therefor a drilling had to be made next to existing pipe. This project was in a dense city area. |
59 m |
900 mm |
Microtunne |
2016 |
Netherlands |
MJ Oomen |
|
51 m |
0 mm |
Microtunne |
2016 |
Netherlands |
VolkerRail |
|
36 m |
787 mm |
Microtunne |
2016 |
Netherlands |
VolkerRail |
|
36 m |
787 mm |
Microtunne |
2016 |
Netherlands |
Open IJ |
For the benefit of a new sea lock projected next to the existing sea locks the existing cables and pipes must be shifted. The new lock also needs to be fitted with new cables and pipes. In order to carry this out a casing will be installed by means of HDD. |
911 m |
0 mm |
HDD |
2016 |
Cyprus |
Sound & Sea Technology Inc |
Sound & Sea Technology, Inc., (SST) has been contracted by the US Navy to provide services related to technical, cost, project management, and installation support of the Seismo-Hydro-acoustic Data Acquisition System (SHDAS) at RAF Akrotiri Airbase, Cyprus. The SHDAS Project includes 2 Horizontal Directional Drilled
(HDD) shore landings of several cables. |
772 m |
0 mm |
HDD |
2016 |
United-Kingdom |
LiMA |
In order to maintain their supply of raw water to Sutton Hall Water Treatment Works, United Utilities (UU) required LiMA, (a Laing O'Rourke, Imtech and Atkins) AMP6 partnership to install an 800mm polyethylene (PE) pipe under the A483, which is one of the busiest roads leading in to Chester city center. |
441 m |
800 mm |
HDD |
2016 |
United-Kingdom |
DONG Energy via VolkerInfra UK |
The purpose of the works is to supply and install two cable ducting systems through which the offshore export cables can be pulled through. The installation of the cable ducting shall be by means of Horizontal Directional Drilling. |
415 m |
800 mm |
HDD |
2016 |
United-Kingdom |
DONG Energy via VolkerInfra UK |
The purpose of the works is to supply and install two cable ducting systems through which the offshore export cables can be pulled through. The installation of the cable ducting shall be by means of Horizontal Directional Drilling. |
433 m |
800 mm |
HDD |
2016 |
United-Kingdom |
Alstom via VolkerInfra UK |
2 HDD's to facilitate the future export cable installation, connecting the Galloper Wind Farm to the transition joint bay onshore. |
238 m |
710 mm |
HDD |
2016 |
United-Kingdom |
Alstom via VolkerInfra UK |
2 HDD's to facilitate the future export cable installation, connecting the Galloper Wind Farm to the transition joint bay onshore. |
238 m |
710 mm |
HDD |
2016 |
United-Kingdom |
VolkerInfra UK |
2 HDD's crossings under the Railway. This location is part of the 150kV cable route for the Rampion Offshore Wind Farm. |
484 m |
0 mm |
HDD |
2016 |
United-Kingdom |
VolkerInfra UK |
2 HDD's crossings under the Railway. This location is part of the 150kV cable route for the Rampion Offshore Wind Farm. |
471 m |
0 mm |
HDD |
2016 |
France |
Jersey Electricity via VBMS |
|
193 m |
500 mm |
HDD |