icon-arrow-right icon-play icon-close
HomeProjectsProject Database

References

Search our reference database

1375 results
Year Country Client Project Drilled
length
Diameter HDD/MT
2016
Netherlands
Vitens
HDD for a road crossing for the installation of a PE water pipeline between Epe and Zutphen
81 m
450 mm
HDD
2016
Netherlands
Vitens
HDD for a motorway crossing for the installation of a PE water pipeline between Epe and Zutphen
116 m
450 mm
HDD
2016
Netherlands
Vitens
HDD for a road crossing for the installation of a PE water pipeline between Epe and Zutphen
192 m
400 mm
HDD
2016
Netherlands
TenneT
Two HDD's for a cable route between Woensdrecht and Bergen op Zoom
133 m
250 mm
HDD
2016
Netherlands
TenneT
Two HDD's for a cable route between Woensdrecht and Bergen op Zoom
125 m
250 mm
HDD
2016
Belgium
PPS
V&SH realised an HDD for the diversion of existing gas lines, for the benefit of the future widening of the Albertchannel.
795 m
800 mm
HDD
2016
Netherlands
Joulz
For the purpose of the Exxon Mobil connection, two new 150kV connections need to be made. From the powerstation Geervliet 2 to the ExxonMobil station at the Botlekweg in Rotterdam.
441 m
600 mm
HDD
2016
Netherlands
Joulz
For the purpose of the Exxon Mobil connection, two new 150kV connections need to be made. From the powerstation Geervliet 2 to the ExxonMobil station at the Botlekweg in Rotterdam.
468 m
600 mm
HDD
2016
Netherlands
Joulz
For the purpose of the Exxon Mobil connection, two new 150kV connections need to be made. From the powerstation Geervliet 2 to the ExxonMobil station at the Botlekweg in Rotterdam.
680 m
600 mm
HDD
2016
Netherlands
Joulz
For the purpose of the Exxon Mobil connection, two new 150kV connections need to be made. From the powerstation Geervliet 2 to the ExxonMobil station at the Botlekweg in Rotterdam.
680 m
600 mm
HDD
2016
Netherlands
Liander
Liander, a Dutch powergrid operator, intends to create a medium-voltage connection between the powerstation of NUON and the terrain of Rijkswaterstaat in Velsen-Noord. To make this possible, a HDD is designed which crosses the Binnenkanaal and the Binnenspuikanaal.
945 m
350 mm
HDD
2016
Turkey
Tekfen
The Trans Anatolian Natural Gas Pipeline Project covers the development of the complete construction of a 1.334 km long DN 1400 natural gas pipeline from the Turkish
588 m
300 mm
HDD
2016
Turkey
Tekfen
The Trans Anatolian Natural Gas Pipeline Project covers the development of the complete construction of a 1.334 km long DN 1400 natural gas pipeline from the Turkish
588 m
1400 mm
HDD
2016
Turkey
Tekfen
The Trans Anatolian Natural Gas Pipeline Project covers the development of the complete construction of a 1.334 km long DN 1400 natural gas pipeline from the Turkish
632 m
300 mm
HDD
2016
Turkey
Tekfen
The Trans Anatolian Natural Gas Pipeline Project covers the development of the complete construction of a 1.334 km long DN 1400 natural gas pipeline from the Turkish
629 m
1400 mm
HDD
2016
Belgium
Air Liquide via V&SH N.V.
For the diversion of the existing Air Liquide hydrogen pipeline for the benefit of a future overflow area of the Schelde river.
1040 m
250 mm
HDD
2016
Netherlands
TenneT
MT Waalhaven 20mtr 552 mm
20 m
552 mm
Microtunne
2016
Netherlands
KWS Infra
In the area of Den Haag few existing wastewater pipes are been renewed. Therefor a drilling had to be made next to existing pipe. This project was in a dense living area.
12 m
616 mm
Microtunne
2016
Netherlands
Nederlandse Gasunie
Purpose of the drillingproject is to connect several electricitylines. The connection is made by drilling under existing cables (leidingstraat) and road.
99 m
1720 mm
Microtunne
2016
Netherlands
IXAS
In order to connect several puddles and control surfacewater levels, few drillings are made.
99 m
1080 mm
Microtunne
2016
Netherlands
IXAS
In order to connect several puddles and control surfacewater levels, few drillings are made.
57 m
1080 mm
Microtunne
2016
Netherlands
Plegt & Vos BV
In the area of Almere few existing wastewater pipes are been renewed. Therefor a drilling had to be made next to existing pipe. This project was in a dense city area.
59 m
900 mm
Microtunne
2016
Netherlands
VolkerRail
36 m
787 mm
Microtunne
2016
Netherlands
VolkerRail
36 m
787 mm
Microtunne
2016
United-Kingdom
LiMA
In order to maintain their supply of raw water to Sutton Hall Water Treatment Works, United Utilities (UU) required LiMA, (a Laing O'Rourke, Imtech and Atkins) AMP6 partnership to install an 800mm polyethylene (PE) pipe under the A483, which is one of the busiest roads leading in to Chester city center.
441 m
800 mm
HDD
2016
United-Kingdom
DONG Energy via VolkerInfra UK
The purpose of the works is to supply and install two cable ducting systems through which the offshore export cables can be pulled through. The installation of the cable ducting shall be by means of Horizontal Directional Drilling.
415 m
800 mm
HDD
2016
United-Kingdom
DONG Energy via VolkerInfra UK
The purpose of the works is to supply and install two cable ducting systems through which the offshore export cables can be pulled through. The installation of the cable ducting shall be by means of Horizontal Directional Drilling.
433 m
800 mm
HDD
2016
United-Kingdom
Alstom via VolkerInfra UK
2 HDD's to facilitate the future export cable installation, connecting the Galloper Wind Farm to the transition joint bay onshore.
238 m
710 mm
HDD
2016
United-Kingdom
Alstom via VolkerInfra UK
2 HDD's to facilitate the future export cable installation, connecting the Galloper Wind Farm to the transition joint bay onshore.
238 m
710 mm
HDD
2016
France
Jersey Electricity via VBMS
193 m
500 mm
HDD
2016
Netherlands
Open IJ
For the benefit of a new sea lock projected next to the existing sea locks the existing cables and pipes must be shifted. The new lock also needs to be fitted with new cables and pipes. In order to carry this out a casing will be installed by means of HDD.
913 m
200 mm
HDD
2016
Netherlands
Open IJ
For the benefit of a new sea lock projected next to the existing sea locks the existing cables and pipes must be shifted. The new lock also needs to be fitted with new cables and pipes. In order to carry this out a casing will be installed by means of HDD.
497 m
560 mm
HDD
2016
Netherlands
Open IJ
For the benefit of a new sea lock projected next to the existing sea locks the existing cables and pipes must be shifted. The new lock also needs to be fitted with new cables and pipes. In order to carry this out a casing will be installed by means of HDD.
429 m
450 mm
HDD
2016
Germany
Vattenfall via Trapp Infra
Grubenwasser
220 m
1200 mm
HDD
2016
Germany
Vattenfall via Trapp Infra
Grubenwasser
220 m
1400 mm
HDD
2016
Belgium
WarmteNet Gent
Crossing the Gent-Terneuzen Sea channel to connect the
452 m
355 mm
HDD
2016
Belgium
WarmteNet Gent
Crossing the Gent-Terneuzen Sea channel to connect the
436 m
355 mm
HDD
2016
Belgium
WarmteNet Gent
Crossing the Gent-Terneuzen Sea channel to connect the
449 m
180 mm
HDD
2015
Norway
Kjeldaas
HDD for a river crossing for the installation of a PE duct in
905 m
315 mm
HDD
2015
Norway
Kjeldaas
HDD for a river crossing for the installation of a PE duct in Hammeren
1282 m
450 mm
HDD
2015
Netherlands
CBB
HDD for a road and rail crossing for the installation of a steel water pipeline in Badhoevedorp
720 m
1200 mm
HDD
2015
Netherlands
CBB
HDD for a road and rail crossing for the installation of a steel water pipeline in Badhoevedorp
720 m
1200 mm
HDD
2015
Netherlands
CBB
HDD for a road and rail crossing for the installation of a steel water pipeline in Badhoevedorp
733 m
710 mm
HDD
2015
Netherlands
CBB
HDD for a road and rail crossing for the installation of a steel water pipeline in Badhoevedorp
733 m
710 mm
HDD
2015
Netherlands
CBB
HDD for a road and rail crossing for the installation of a steel water pipeline in Badhoevedorp
595 m
600 mm
HDD
2015
Belgium
Praxair via Denys & V&SH NV
HDD for a road and rail crossing in Antwerp
247 m
90 mm
HDD
2015
Belgium
Praxair via Denys & V&SH NV
HDD for installation of a bundle of PE ducts (2x
247 m
250 mm
HDD
2015
Belgium
Praxair via Denys & V&SH NV
HDD for a road crossing in Antwerp
475 m
250 mm
HDD
2015
Belgium
Praxair via Denys & V&SH NV
HDD for a road and rail crossing in Antwerp
160 m
90 mm
HDD
2015
Belgium
Praxair via Denys & V&SH NV
HDD for a road crossing in Antwerp
173 m
160 mm
HDD
+